For a similar factors that company personnel are not likely to witness the precise surface area h2o connections demanded under the 2020 NWPR for the duration of a site check out in dry regions or throughout the dry period, They're also unlikely to seize evidence of the area water link between a stream and also a downstream common navigable water or